Florida Department of Environmental Protection Florida Department of Environmental Protection
 
* DEP Home * About DEP * Programs * Contact * Site Map * Search
MyFlorida.com  
Corner of tabWatershed Assessment

Basin Status and Assessment Reports

 

In Phase 1 of the TMDL Development Cycle, a Status Report is developed for each river basin, containing a Planning List of potentially impaired waters that may require the establishment of TMDLs. The report characterizes each basinís hydrologic, ecological, and socioeconomic setting as well as historical, current, and proposed watershed management issues and activities. It also contains a preliminary evaluation of major water quality parameters, water quality issues by planning unit, an evaluation of ecological resources, and basinwide pollutant loading trends related to land uses.

In Phase 2 of the cycle, an Assessment Report is developed for each river basin, containing a Verified List of impaired waters that will require the establishment of TMDLs.

Status Reports for the Group 1, 2, 3, & 4 basins have been completed.  Assessment Reports for the Group 1 basins have been completed.  All of these reports are available at the Basin Rotation website.  To view an individual report, select the basin group below, and then a basin from the map.  A link to status report or assessment report can be found from each basin's page.


For more information, send e-mail to Kevin O'Donnell (Kevin.ODonnell@dep.state.fl.us)

Watershed Assessment
2600 Blair Stone Road - Mail Station 3560
 Tallahassee, FL, 32399-2400
Phone: (850) 245-8433

Last updated: September 21, 2011

  2600 Blair Stone Road M.S. 3500   Tallahassee, Florida 32399   850-245-8336 (phone) / 850-245-8356 (fax) 
DEP Home | About DEP  | Contact Us | Search |  Site Map