Florida Department of Environmental Protection Florida Department of Environmental Protection
 
* DEP Home * About DEP * Programs * Contact * Site Map * Search
MyFlorida.com  
Programs
Information
Get Adobe Acrobat Reader software.

Documents are Adobe Acrobat files, which will open in a new window, unless indicated, and require the free Reader Software.

Coastal Construction Control Line (CCCL) Permit Fees

Coastal Construction Control Line (CCCL) Permit Fees
 

The total permit fee shall be the sum of the fees assessed for each individual major structure plus any additional fee for minor structures or activities. The fees for each activity, experimental project, rigid coastal structure, permit modification, time extension, permit renewal, area wide permit, or structure or addition, when any portion of the foundation or any habitable portion of such structure or addition is proposed by the applicant to extend seaward of the coastal construction control line, shall be assessed in accordance with the following schedule:

 For more information regarding the Coastal Construction Control Line Permit or fees, please see Chapter 62B-33, Florida Administrative Code or contact a staff member from Coastal Protection and Engineering.

Coastal Construction Control Line Permit Fees Chapter 62B-33.0085, F.A.C.

  1. Major structures
  2. Minor Structures
  3. Additions to Existing Habitable Structures
  4. Revisions or Modifications of Approved Permits
  5. Experimental Projects
  6. Other Construction, Structures, and Activities
  7. Time Extension
  8. Permit Renewal
  9. Fee Waiver
  10. Development Agreements

  1. Major Structures

    1. Non-inhabitable major structures (Roads, bridges, storm water outfalls, cabanas, garages, swimming pools, etc.) - $1,000
    2. Habitable major structures with a roof footprint for a single family dwelling:
      1. Less than or equal to 2,400 sq. feet - $2,000
      2. Equal to or greater than 2,400 sq.feet - $4,000
    3. Multi-Family dwelling (e.g., hotels, motels, apartment buildings, & condominiums) - $5,000 Plus $100 per dwelling unit for each dwelling unit in the structure
    4. Other major habitable structures - $3,000
  1. Minor Structures

    1. A single minor structure - $300
    2. Multiple minor structures - $500
    3. One or more minor activities - $300
      (Minor activities include but are not limited to dune construction and enhancement, placement of fill, and removal of debris. Minor structures and activities exclude minor structures and activities authorized by a field permit.)
  2. Additions to Existing Habitable Structures

    1. Additions to existing habitable structures for a single family dwelling - $1,000
    2. Additions to a multi-family dwelling
      1. First Unit - $2,500
      2. Each additional unit - $100
  3. Revisions or Modifications of Approved Permits

    1. Modification which includes revisions to a permitted minor structure or activity and does not include a new minor structure or activity. - $150
    2. Modification which includes revisions to a permitted major structure or dwelling unit and does not include a new major structure or dwelling unit. - $500
    3. Modification to a permit for a minor structure which adds a new minor structure or activity - $300
    4. Modification to a permit for a major structure(s) which adds a new major structure or dwelling unit(s) - $500
  4.   Experimental Projects

    1. Experimental projects permitted in accordance with Section 161.053, Florida Statutes, and section 27, Chapter 89-175, Laws of Florida - $3,000
  5. Other Construction, Structures, and Activities

    1. Other Activities (include, but are not limited to minor reconstruction of coastal protection structures, repairs to major structures, excavation, and large landscaping projects) - $500
    2. Rigid Coastal Structures
      1. First 100 ft. in length - $3,000
      2. Each additional 50 feet in length or portion thereof - $500
    3. Area Wide Permits pursuant to section 161.053 (18), Florida Statutes - $500
  6. Time Extension*

    1. Projects that are certified by a professional engineer or architect registered in the State of Florida and are:
      1. at least 50% complete - $500
      2. less than 50% complete or 10% of the original permit fee, whichever is greater. - $750
    *(Note: In order to be eligible for a time extension, a request must be filed in writing with the Bureau of Beaches and Coastal Systems prior to the permit expiration date.
     
  7. Permit Renewal

    1. Permit Renewal - $1,000 Or 10% of the original permit fee whichever is greater or in cases in which a request for a time extension or in cases in which a request for a time extension is not received prior to the permit expiration date. 
  8. Fee Waiver

    1. For projects that are cost shared under Chapter 161.101, Florida Statutes, with the state government, the local government may request a waiver of that portion of the fee above the local government pro rata share. Example: local share 50%, computed total fees $5,000, waived fee is $2,500, local pro rata fees $2,500. In no case will the local pro rata share be less than $2,000.
  9. Development Agreements

    1. Development Agreements pursuant to 161.0531, Florida Statute - $2,000

Last updated: February 27, 2013

  2600 Blair Stone Road M.S. 3500   Tallahassee, Florida 32399   850-245-8336 (phone) / 850-245-8356 (fax) 
DEP Home | About DEP  | Contact Us | Search |  Site Map